46th Legislative District 2014 Session – HB 237 Final Road Projects
Project No. & Description | 2012 HB 267/EN | |||
05-122 – Outer Loop, Fegenbush Lane, and Beulah Church Road: Major revision of the intersection located at the Outer Loop, Fegenbush Lane, and Beulah Church Rd. Turn Lane was completed by Transportation Cabinet per agreement.
|
C | SPP | 2014 | 4,950,000 |
05-205 – I-65 Southbound Ram at KY-1065: Reconstruct second curve only on I-65 Southbound Ramp at KY-1065 (Outer Loop)
|
C | IM | 2014 | 1,820,000 |
05-263 – I-265/KY-61: Improve I-265/KY-61 (Preston Hwy) Interchange as recommended by KIPDA’s Interchange Study. | C | IM | 2014 | 3,700,000
|
05-404.01 – Cooper Chapel Road: Extend Cooper Chapel Rd. from Beulah Church Rd. to Bardstown Rd. (Local Match) | D
R |
SLO
SLO |
2014
2014 |
1,000,000
3,750,000
|
05-443.1 – Mt. Washington Rd (KY-2053) Section 1: from Preston to Maple Way. | D
R U
|
SLO
SLO SLO |
2014
2015 2015 |
320,000
490,000 120,000 |
05-443.2 – Mt. Washington Rd (KY-2053) Section 2: from Maple Way to Cedar Creek Rd. | D
|
SLO | 2014 | 290,000 |
05-8402 – McNeely Lake Park Road: Design and construct (Phase 3) a new North/South Park Rd on the East Side of the Lake traversing the Quail Chase Golf Course to connect with Phase 2 and South McNeely Lake Access Area on Cedar Creek Rd. | R
C |
SPP
SPP |
2014
2014 |
170,000
3,950,000 |
05-8611 – Mt. Washington Road: Improve and widen Mt. Washington Rd from Preston Highway to Penn Run Creek Bridge
|
D
R U C |
STP
SP SP SP |
2014
2014 2014 2016 |
600,000
3,040,000 6,910,000 10,250,000 |
05-8612 – Mt. Washington Road: Improve and widen Mt. Washington Rd. from Penn Run Creek Bridge to Cedar Creek Rd.
|
D
R U C |
SP
SP SP SP |
2014
2015 2015 2016 |
800,000
2,020,000 1,850,000 7,910,000 |
NEW: 05-8804 – Design and construct a multi-model directional non-vehicular and vehicular safety project at the University of Louisville Belknap Campus. First year to include construction funds for roundabout at Floyd St. and Cardinal Blvd. and intersection at Brandeis and Arthur St. (UL Foundation will pay $4.5 toward $22.5M total project [80/20 match]. Match to be paid up front and applied to first year)
|
D
R U C |
SPP SPP |
2014 2014 |
1,350,000 5,000,000 |
NEW: 05-8805 – Design and construct a multi-model directional non-vehicular and vehicular safety project at the University of Louisville Belknap Campus. First year to include construction funds for roundabout at Floyd St. and Cardinal Blvd. and intersection at Brandeis and Arthur St. (UL Foundation will pay $4.5 toward $22.5M total project [80/20 match]. Match to be paid up front and applied to first year)
|
D
R U C |
SPP |
2015 |
11,650,000 |
NEW: 05-8806 – Construct a sound wall on the North side of I-265 between Smyrna Parkway and Pennsylvania Run Rd | D
R U C |
SPP |
2014 |
2,304,000 |
D = Design IM = Interstate Maintenance Funding
R = Right of Way SP = State Funding
U = Utility SPP = State Priority Funding
C = Construction SLO = Federal Funding