Project No. & Description 2012 HB 267/EN
05-122 – Outer Loop, Fegenbush Lane, and Beulah Church Road: Major revision of the intersection located at the Outer Loop, Fegenbush Lane, and Beulah Church Rd. Turn Lane was completed by Transportation Cabinet per agreement.

 

C SPP 2014 4,950,000
05-205 – I-65 Southbound Ram at KY-1065: Reconstruct second curve only on I-65 Southbound Ramp at KY-1065 (Outer Loop)

 

C IM 2014 1,820,000
05-263 – I-265/KY-61: Improve I-265/KY-61 (Preston Hwy) Interchange as recommended by KIPDA’s Interchange Study. C IM 2014 3,700,000

 

05-404.01 – Cooper Chapel Road: Extend Cooper Chapel Rd. from Beulah Church Rd. to Bardstown Rd. (Local Match) D

R

SLO

SLO

2014

2014

1,000,000

3,750,000

 

05-443.1 – Mt. Washington Rd (KY-2053) Section 1: from Preston to Maple Way. D

R

U

 

SLO

SLO

SLO

2014

2015

2015

320,000

490,000

120,000

05-443.2 – Mt. Washington Rd (KY-2053) Section 2: from Maple Way to Cedar Creek Rd. D

 

SLO 2014 290,000
05-8402 – McNeely Lake Park Road: Design and construct (Phase 3) a new North/South Park Rd on the East Side of the Lake traversing the Quail Chase Golf Course to connect with Phase 2 and South McNeely Lake Access Area on Cedar Creek Rd. R

C

SPP

SPP

2014

2014

170,000

3,950,000

05-8611 – Mt. Washington Road: Improve and widen Mt. Washington Rd from Preston Highway to Penn Run Creek Bridge

 

D

R

U

C

STP

SP

SP

SP

2014

2014

2014

2016

600,000

3,040,000

6,910,000

10,250,000

05-8612 – Mt. Washington Road: Improve and widen Mt. Washington Rd. from Penn Run Creek Bridge to Cedar Creek Rd.

 

D

R

U

C

SP

SP

SP

SP

2014

2015

2015

2016

800,000

2,020,000

1,850,000

7,910,000

NEW: 05-8804 – Design and construct a multi-model directional non-vehicular and vehicular safety project at the University of Louisville Belknap Campus. First year to include construction funds for roundabout at Floyd St. and Cardinal Blvd. and intersection at  Brandeis and Arthur St. (UL Foundation will pay $4.5 toward $22.5M total project [80/20 match]. Match to be paid up front and applied to first year)

 

D

R

U

C

 

 

SPP

SPP

 

 

2014

2014

 

 

1,350,000

5,000,000

NEW: 05-8805 – Design and construct a multi-model directional non-vehicular and vehicular safety project at the University of Louisville Belknap Campus. First year to include construction funds for roundabout at Floyd St. and Cardinal Blvd. and intersection at  Brandeis and Arthur St. (UL Foundation will pay $4.5 toward $22.5M total project [80/20 match]. Match to be paid up front and applied to first year)

 

D

R

U

C

 

 

 

SPP

 

 

 

2015

 

 

 

11,650,000

NEW: 05-8806 – Construct a sound wall on the North side of I-265 between Smyrna Parkway and Pennsylvania Run Rd D

R

U

C

 

 

 

SPP

 

 

 

2014

 

 

 

2,304,000

 

D = Design                                IM = Interstate Maintenance Funding

R = Right of Way                       SP = State Funding

U = Utility                                 SPP = State Priority Funding

C = Construction                        SLO = Federal Funding